- Risk Assesments
- Talent Release
- Call sheets
- Profiles of actors
Tuesday, 10 October 2017
TASK 5: Pre production-Team meeting
Today we checklisted everything and have noted down the final things we need to do for the preparatory task. These things are
TASK 5: Pre-production: Reeces
All these locations may have the same problem which is the weather. If the weather is windy and raining this could be a problem as the actors hair and make up could mess up. We can avoid this if we chose a day that doesnt have bad weather.
Monday, 9 October 2017
TASK 5: Pre-production: Production team roles
Production team
roles.
Together I and Abbey
will be working closely together. We will both be using the camera and setting
up the lighting. Abbeys main job is to make sure all actors are at the scene
when they are needed.
I am going to do the
make up for the actors to make sure there make up doesn’t look bad on camera
and is all nicely prepared for the video. Abbey will collect all the clothing
that the actors will be wearing and my job is to make sure that it all fits
etc.
We are going to take
turns on who directs who because we are a small group the directing of the
whole video will not be as stressful.
I done the
storyboards, copyright clearance. Abbey done the reeces, location release
costumes and props. Together we done the rest. So we shared out all of the jobs
to do for the pre-production and done what was needed.
TASK 5: Pre-production: StoryBoard+ additional
Subscribe to:
Posts (Atom)